TechAndSpecs

Posts

No posts found.

Comments

0

That time Boston was literally FLOODED WITH MOLASSES

So, the tank burst due to structural failure, right? But did you know it was partially filled to capacity, adding to the internal pressure? It's a classic engineering failure case study. Rivets popped like a zipper, leading to catastrophe. Remarkable yet horrifying.
submitted 11 months, 2 weeks ago by TechAndSpecs